Sign In
Sign Up
Construction Scheduling with Primavera Project Planner
Leslie Feigenbaum
1998
-
/
5
0 votes
Building -- Superintendence
Superintendence
Primavera Project Planner (P3)
xii, 340 p. : 29 cm
The Power
3.9
35 votes
San Manuel Bueno, mártir
4.1
15 votes
The blue castle
3.6
17 votes
The Contaxis Baby
3.8
20 votes
Faust
4.1
31 votes
One Night With His Wife
3.7
23 votes
The Raven
4.3
31 votes
Le Comte de Monte Cristo
4.3
160 votes
Out From Boneville
4.0
15 votes
The Year of Magical Thinking
4.1
17 votes
Their Eyes Were Watching God
4.1
37 votes
Harold and the Purple Crayon
4.4
17 votes
"Surely You're Joking, Mr. Feynman"
4.2
98 votes
A Kingdom of Dreams
4.5
25 votes
The Godfather
4.4
31 votes
At the Mountains of Madness
3.8
37 votes
The Godfather
4.4
35 votes
Are You My Mother?
4.3
54 votes
The Blind Watchmaker
3.9
21 votes
Dr. Seuss's ABC
4.5
20 votes
The 5 AM Club
3.2
16 votes
Dork Diaries 7
4.5
32 votes
Captain Underpants and the Attack of the Talking Toilets
4.4
16 votes
Deep Work
3.9
129 votes
The wimpy kid movie diary
4.0
40 votes
The Phoenix Project
4.1
52 votes
No Logo
3.4
19 votes
I Can Read With My Eyes Shut!
4.1
30 votes
The Adventures of Captain Underpants
4.3
55 votes
Creativity, Inc.
4.5
18 votes
Hop on Pop
3.7
16 votes
The Psychology of Everyday Things
4.1
52 votes
Red Mars
3.7
67 votes
Zero to One
4.2
50 votes
Goosebumps - Welcome to Dead House
4.1
27 votes
Double Down
4.5
96 votes
Taming of the Shrew
3.4
23 votes
Romeo and Juliet
3.6
163 votes
Evicted
4.3
18 votes
Guns, germs, and steel
4.1
134 votes
Hamlet
4.0
140 votes
Othello
3.8
39 votes
Twelfth Night
3.7
28 votes
Julius Caesar
3.5
47 votes
Harry Potter and the Deathly Hallows
4.3
367 votes
A Midsummer Night's Dream
3.7
72 votes
The power of positive thinking
4.2
73 votes
To Kill a Mockingbird
4.1
153 votes