Sign In
Sign Up
Electrical change order cost data 2013
Rsmeans Engineering Department
-
/
5
0 votes
Estimates
Electrical Engineering
Devis Estimatifs
Red Mars
3.7
67 votes
Don't Make Me Think
4.1
15 votes
Your Fault
3.9
18 votes
Leviathan (Leviathan #1)
3.9
22 votes
Masters of Doom
4.1
32 votes
The Psychology of Everyday Things
4.1
52 votes
Player Piano
3.8
27 votes
To Be Taught, If Fortunate
4.2
26 votes
Design Patterns
3.9
30 votes
The fountains of paradise
4.1
17 votes
The Difference Engine
3.3
22 votes
The Ringworld Engineers
3.8
25 votes
The Mythical Man-Month
4.2
28 votes
The Soul of a New Machine
4.1
15 votes
Black Wind (Dirk Pitt #18)
3.7
45 votes
Jurassic Park
4.1
145 votes
Next
3.3
21 votes
The Innovators
3.9
18 votes
Bad Blood
4.3
51 votes
Dawn
4.1
30 votes
Firestarter
3.8
23 votes
Brave New World and Brave New World Revisited
4.2
37 votes
Hackers
4.1
21 votes
Airframe
3.7
79 votes
The Green Mile
4.3
80 votes
Steve Jobs
4.1
141 votes
Altered Carbon
3.9
50 votes
MaddAddam (MaddAddam Trilogy, Book 3)
3.1
17 votes
Elon Musk
4.1
142 votes
The Angel Experiment: A Maximum Ride Novel (Book 1)
3.9
21 votes
Startide Rising
3.8
16 votes
Oryx and Crake
4.2
44 votes
The Year of the Flood
4.0
27 votes
Life, the Universe and Everything
4.2
101 votes
Midnight in Chernobyl
4.6
15 votes
How to Do Nothing
4.0
17 votes
Einstein
4.2
23 votes
White Teeth
3.7
16 votes
Ender's Game
4.3
324 votes
Brave New World
3.9
386 votes
My Sister's Keeper
3.6
27 votes
At Home
4.0
29 votes
The Adventures of Sherlock Holmes
4.2
155 votes
The Art of War
4.1
93 votes
Leonardo
4.0
32 votes
Sherlock Holmes
4.5
43 votes
To Kill a Mockingbird
4.1
153 votes
How to Win Friends and Influence People
4.3
195 votes